OCT. 2016 EAA BIPLANE https://www.1218.eaachapter.org/apps/photos/ OCT. 2016 EAA BIPLANE 10-03-2016 GOING FORWARD BACKWARDS. MUCH OF THE BOOT COWLING WAS REMOVED TO INSTALL FLOOR BOARDS, INSTRUMENTS AND OTHER NECESSARY ITEMS. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203034071 203034071 10-03-2016 SONNY SANDS PRIMER TOUCHING UP THE RUDDER. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203034073 203034073 10--03-2016 AFTER LUNCH THE CREW WENT TO VIEW KENT'S REBUILD PROJECT, A STAR DUSTER TWO NAMED LULU. LULU WAS THE ORIGINAL BUILDER'S WIFE.. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203034074 203034074 10-03-2016 LEFT WINGS WERE RUINED AFTER HITTING TWO ROUND HAY BALES DURING A FORCED LANDING. VIEW FORWARD AS DAVID CHECKS OUT THE COCKPIT. SONNY CHECKS THE CABINE STRUTS. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203034075 203034075 10-10-2016 DAVID AND JERRY INSTALL COWLING FASTENERS. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203081027 203081027 10-10-2016 BERLIN, JOHN AND RON WORK ON CONTROL SYSTEMS. INSTALLING BOLTS, WASHERS, NUTS AND SAFETY COTTER PINS.. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203081029 203081029 10-10-2016 BERLIN WORKS ON THE RIGHT RUDDER PEDAL. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203081030 203081030 10-10-2016 JOHN WORKS ON THE LEFT RUDDER PEDAL. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203081031 203081031 10-10-2016 ENGINE COWLING AWAITS FURTHER WORK, I.E. RIVETS. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203081032 203081032 10-17-2016 KENT DONATED HIS DAMAGED STAR DUSTER TWO TO CHAPTER 1218. KENT STANDS BY THE ENGINE. THIS WORK DAY WAS USED TO TRANSPORT THE PLANE TO OUR HANGER. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203144248 203144248 10-17-2016 CREW IS REMOVING THE TOP WING. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203144249 203144249 10-17-2016 FUSELAGE IS LOADED ON BERLIN'S TRAILER. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203144250 203144250 10-17-2016 WINGS AND OTHER ITEMS ARE LOADED ONTO DAVID'S TRAILER. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203144251 203144251 10-17-2016 NEW LEFT BOTTOM WING THAN KENT BUILT AND BEHIND THE GOOD RIGHT BOTTOM WING. VIEWED IN OUR 1218 HANGER. EVERYTHING IS UNLOADED AND STORED FOR FUTURE WORK. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203144252 203144252 10-24-2016 TODAY THE EAA BIPE WORK CONSISTED OF INSTALLING INSTRUMENTS AND BREAK SYSTEMS. THE STAR DUSTER PROJECT WAS STARTED TODAY WITH WASHING THE TOP WING SECTIONS. PICTURED HERE ARE JOHN AND JERRY AT WORK. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203183354 203183354 10-24-2016 JERRY ALSO SCRUBS THE WING. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203190674 203190674 10-24-2016 BILL RINSES THE WING AND JERRY WATCHES. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203190672 203190672 10-24-2016 STAR DUSTER'S TOP WING LAYED OUT ON TABLES. JOHN, JERRY AND RON AT FAR END. ON LEFT BERLIN AND DAVID INSTALLING INSTRUMENTS IN THE EAA BIPLANE. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203183355 203183355 10-24-2016 JOHN, JERRY AND RON DISASSEMBLING PARTS FROM DAMAGED STAR DUSTER'S LEFT WING SECTION. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203183356 203183356 10-24-2016 JOHN AND RON INSTALLING SALVAGED STAR DUSTER'S WING ROOT SPAR FITTINGS. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203183357 203183357 10-24-2016 JOHN AND RON INSTALLING FRONT SPAR ROOT FITTING TO THE STAR DUSTER'S NEW FRONT SPAR. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203183358 203183358 10-24-2016 SONNY DIRECTS, RON ATTACHES AND BILL ALIGNS THE FRONT SPAR WING ROOT FITTING. IN PREPARATION FOR DRILLING BOLT HOLES, USING THE FITTING AS A GUIDE. https://www.1218.eaachapter.org/apps/photos/photo?photoID=203190673 203190673